Requires that any application for a permit to withdraw surface water or ground water include a water auditing plan and a leak detection and repair plan that comply with regulations adopted by the State Water Control Board pursuant to the provisions of the bill. The provisions of the bill shall not become effective until 30 days after the adoption by the Board of such regulations.
 
 
 
1/12/21 Senate: Referred to ACNR
1/17/21 Reported from ACNR with amendment (8-Y 7-N)
1/26/21 Passed Senate (22-Y 17-N)
2/2/21 Referred to ACNR
2/8/21 House: Continued to Special Session in ACNR by voice vote
2/15/21 ACNR Subc recommends reporting (6-Y 2-N)
2/17/21 Reported from ACNR (13-Y 8-N)
2/22/21 Passed House (56-Y 44-N)
Sponsors